Latest news, Wikipedia summary, and trend analysis.
This topic has appeared in the trending rankings 1 time(s) in the past year. While it does not trend frequently, its appearance suggests a renewed or concentrated surge of public interest.
Based on Wikipedia pageviews and search interest, this topic gained significant attention on the selected date.
This topic is not currently in the ranking.
The Chaira Pumped Storage Hydro Power Plant was built in the Rila mountain range, about 100 kilometres (62 mi) southeast of Bulgaria's capital city, Sofia. Part of the major Belmeken–Sestrimo–Chaira Hydropower Cascade, Chaira has generating capacity of 864 megawatts (1,159,000 hp) and a pumping capacity of 788 megawatts (1,057,000 hp). The power plant is equipped with four reversible Francis pump-turbines, each rated at 216 megawatts (290,000 hp) in the generating mode, and 197 megawatts (264,000 hp) in pumping mode.
Units 1 and 2 have been in operation since 1995, and at that time Chaira was the largest pumped-storage plant in southeast Europe with the highest head in the world for a single-stage pump turbine. Units 3 and 4 came online in 1999.
The pump-turbines and motor-generators were supplied by Toshiba, and three of them were manufactured under Japanese supervision in Bulgaria. The upper basin for Chaira is formed by the Belmeken Dam which connects to the pumped storage plant by two headrace tunnels with a diameter of 4.2 metres (14 ft) and two penstocks with diameter 4.4 metres (14 ft), reducing to 4.2 metres (14 ft). Outflow from the Belmeken reservoir supplies the Sestrimo Hydro Power Plant
No recent news articles found.
This topic has recently gained attention due to increased public interest. Search activity and Wikipedia pageviews suggest growing global engagement.
Search interest data over the past 12 months indicates that this topic periodically attracts global attention. Sudden spikes often correlate with major news events, public statements, or geopolitical developments.